MAYO IOB & TOWER EXPANSION

 

Mayo Clinic Integrated Oncology Building & Bed Tower Expansion, Jacksonville, Florida

 
 

 


UFI is currently constructing Mayo Clinic’s state-of-the-art Integrated Oncology Building (IOB) located on their Jacksonville campus. The IOB is a 3 story, 140,000 sf facility that will house three linear accelerators, two proton therapy gantries, one fixed-beam room for carbon therapy FDA trials, one proton carbon synchrotron housing room and 4 lifts of shearwalls.

The IOB contains six entry maze wall formations of varying thicknesses and elevations, an elevated perimeter shielding wall shell 3’-4” thick and nearly 17’ tall, 7’-6” thick proton gantry walls and a 13’- 1 ½” wall behind the fixed-beam room. Elevated, monolithic slab pours for the linear accelerator had thicknesses ranging from 8’-6” to 4’-6”, and the shielding roofs for the proton gantries are nearly 40’ above the slab below and 5’-6” thick.

UFI also recently completed 5 lifts of shearwalls for the Mayo Clinic’s bed tower expansion over two weeks ahead of schedule. The project adds 428 patient beds and 250,000 sf to the existing structure, taking it from 8 stories to 13 stories.

Scope Of Work

STRUCTURE TYPE

Mild Reinforced Slab and Beam

SCOPE OF WORK

Turn-key

FORMING SYSTEM

140,000 sq. ft.

GENERAL CONTRACTOR

Robins & Morton

ELEVATED SLABS

245,000 sq. ft.

LOCATION

Jacksonville, FL

TOTAL CYDS OF CONCRETE

24,300 cy

PROJECT TYPE

Medical