Universal Forming is a concrete structure subcontractor, specializing in multi-story, cast in place structures.




This new Modera luxury apartment community is ideally located at the intersection of the Grand Central District, the Edge District, and the Warehouse Arts District in St. Petersburg, offering residents prime access to the best food, art, and culture that the city has to offer.
The community includes a 20-story high-rise tower, an 8-story mid-rise building, and a 6-story parking garage. Construction sequencing was a key challenge that UFI navigated by utilizing two separate crews to build both residential buildings simultaneously. With the high-rise building running on a 6-day cycle and the mid-rise building running on a 12-day cycle, both structures reached topping out at approximately the same time, followed by the completion of the parking garage. This carefully coordinated schedule allowed the team to meet the client’s critical path milestones.
Apartment tower: 20 Level 8″ post tension slabs Apartment Mid rise: 8 level 6″ mild reinforced tunnel slabs (formed conventionally) Garage: 6 Level 8″ post tension slabs
Turn-key
Truss tables & Hand set
GC MCRT South Florida Construction LLC
670,000 sf
St Petersburg, FL
29,000 cy
Type Multi Family